Basic
Basic is the first section of the Adjustments panel and the one you will use on almost every photo. It sets the overall brightness and contrast, and recovers detail in bright and dark areas.
Open the Adjustments panel with D.
The Adjustments panel header
The header of the panel has three buttons:
| Button | What it does |
|---|---|
| Auto Adjust Image (magic wand) | Sets Exposure, Contrast, Highlights, Shadows, Whites, Blacks, Vibrance, Clarity, Dehaze, Centré and Vignette for a balanced starting point. Right-click to choose Subtle, Normal or Strong. White balance and curves stay as they are. |
| Toggle Analytics Display (chart) | Shows the histogram, waveform or vectorscope above the sliders. See Editor View → Image analytics. |
| Reset Adjustments | Resets every adjustment on this photo. |
Auto Adjust in the header works on the open photo. To auto-adjust many photos at once, select them in the library, right-click and choose Productivity → Auto Adjust.
Working with sliders
These work on every slider in RapidRAW:
- Click the number to type an exact value.
- Double-click the slider track, or click the slider's name, to reset it.
- Hold
ShiftorAltwhile dragging for fine control (5x slower). - Hold
Shiftand use the mouse wheel over a slider to step it.
Each section header also has an eye icon that turns the whole section off, which is handy to see what a section is doing. Right-click a section header for Copy, Paste and Reset of just that section, and Customize Panels to hide or reorder tools.
Tone Mapper and Exposure
| Control | What it does |
|---|---|
| Tone Mapper | Decides how the very wide brightness range of a RAW file is squeezed into what your screen can show. Basic or AgX. Click the "Tone Mapper" label to reset both the tone mapper and Exposure. |
| Exposure | Makes the whole image brighter or darker in linear light, like changing exposure on the camera. Range −5 to +5. Each +1.00 is a bit more than one stop (about 1.25 EV). |
Basic (the default) is a neutral curve. It gives you a look close to what most cameras and editors produce, but very bright areas clip to white quite abruptly.
AgX handles around 20 stops of dynamic range and rolls bright areas off smoothly into white, the way film does. Skies near the sun, stage lights and neon keep their color instead of turning into flat white or yellow. AgX images look a little flatter at first, so you will often add some Contrast.
When to pick which:
- Basic: normal daylight scenes, when you want to match other software, product photos.
- AgX: sunsets, night scenes, concerts, backlit portraits, any scene with very bright light sources.
If you always want the same tone mapper, set it once in Settings → Global Tonemapper Override. The switch then disappears from this panel.
New to this? What's a "stop"?
A stop doubles or halves the light. +1 stop is twice as bright, −1 stop half as bright. It is the same unit your camera uses for exposure compensation. Exposure in RapidRAW is a little stronger than one stop per 1.00, so use small steps (0.1 to 0.3) for fine-tuning.
Tonal sliders
All of these go from −100 to +100.
| Slider | What it does |
|---|---|
| Contrast | Makes darks darker and lights lighter around the middle grey (positive), or flattens the image (negative). |
| Highlights | Works on the bright parts. Negative pulls bright areas down and brings back texture in skies and skin. In blown-out areas it also removes color casts so they fade to clean white. Positive brightens the bright parts. |
| Shadows | Works on the dark parts. Positive opens up shadows to show detail, negative deepens them. |
| Whites | Moves the top end of the tonal range. Positive makes the brightest tones brighter and adds sparkle. Negative compresses them, which helps with nearly clipped areas. |
| Blacks | Moves the very bottom of the tonal range. Negative gives deep, rich blacks. Positive lifts crushed blacks. |
| Brightness | Brightens or darkens the midtones after the tone mapper, while keeping pure black and pure white in place. Range −5 to +5. |
Highlights, Shadows, Whites and Blacks are edge-aware: they look at the surrounding area, so they recover local detail without the grey halos you get from simple tone curves.
Which tones each slider changes
Each slider works on its own part of the histogram. Read the chart below from left (black) to right (white): where a curve is high, that slider has its strongest effect.
A few things the chart shows:
- Blacks and Whites are the gentlest sliders and work closest to the ends of the histogram. On a photo without very dark or very bright areas, even a large value can look like it does little. Use Shadows and Highlights to change larger areas.
- Lowering Highlights is stronger than raising it, and has its biggest effect on the very brightest tones. That's what pulls bright skies back.
- Brightness moves the whole middle of the histogram but never moves pure black or pure white.
Exposure and Contrast work on every tone at once, so they're not in the chart above. Here are all seven sliders as tone curves, like in the Curves panel:
These charts are for a RAW file with the Basic tone mapper, on an even area without texture. The technical reference has the exact formulas.
Exposure vs. Brightness
- Exposure works on the raw light data before the tone mapper. It is the right tool to fix an under- or overexposed shot, and the only one that can really pull detail back from very bright areas in a RAW file.
- Brightness works after the tone mapper. It makes the image look lighter or darker without pushing anything into clipping. Use it for the final "feel".
Example: a photo of a dark forest is underexposed by about one stop. Raise Exposure to +0.8 so the data is in the right place, then use Brightness −0.2 if the result feels too airy.
Highlights and Shadows vs. Whites and Blacks
Highlights and Shadows work on broad areas of the image. Whites and Blacks work on the extremes. A good habit:
- Set Exposure so the midtones (skin, grass, walls) look right.
- Use Highlights and Shadows to recover detail at the bright and dark ends.
- Use Whites and Blacks to set the final end points. Turn on the clipping warnings in the analytics display and stop just before red or blue patches appear.
- Add Contrast back if the image now looks flat.
- Fine-tune the feel with Brightness.
Example values
| Situation | Values to start from |
|---|---|
| Normal RAW, a bit flat | Contrast +15, Highlights −20, Shadows +20, Whites +10, Blacks −10 |
| Bright sky, dark ground | Exposure +0.3, Highlights −60, Shadows +45, Whites −15, Blacks +5 |
| Moody, low-key | Exposure −0.3, Shadows −20, Blacks −25, Contrast +20 |
| Bright and airy | Exposure +0.4, Highlights −30, Shadows +30, Blacks +15, Contrast −10 |
Highlight recovery happens automatically
When a RAW file has clipped color channels (for example a bright sky where the blue channel is clipped but red and green are not), RapidRAW reconstructs the missing information while decoding the file. You don't need a slider for this. Pulling Exposure or Highlights down then reveals the recovered detail.
If an area is clipped in all channels, there is no information left. RapidRAW can make it grey instead of white, but cannot invent texture.
In masks
Inside a mask, Basic has Exposure, Contrast, Highlights, Shadows, Whites, Blacks and Brightness. The tone mapper is always global.
See also
- Curves for precise tonal shaping.
- Recover Highlights & Shadows for a step-by-step recipe.
- Color for white balance and saturation.
RapidRAW